Mosinee, Wisconsin
OWNER:
Milestone Materials
832 WI-153
Mosinee, WI 54455
FACILITY:
Cisler Quarry
115 Bird Lane
Mosinee, WI 54455
ENGINEER:
VAA
2300 Bershire Lane N, Suite 200
Plymouth, MN 55441
GENERAL CONTRACTOR:
Norcon Corporation
DESCRIPTION:
The project required numerous concrete foundations to be formed, reinforcing added, and concrete placed. Work also included setting anchor bolts using custom fabricated anchor bolt templates. Foundations and anchor bolts were laid out utilizing a surveyor as well as a total station surveying instrument.
It is the policy of Norcon Corporation to strive for the highest safety standards on our projects. Safety does not occur by chance. It is the result of careful attention to all company operations by those directly or indirectly involved. Employees at all levels work diligently to execute the company’s policy of maintaining safety and occupational health.
Regard for the safety of the general public, our employees and the employees of our subcontractors are a supreme responsibility of all levels of our organization.