Wood, Lincoln and Forest Counties, Wisconsin
OWNER:
Wisconsin Department of Transportation
ENGINEER:
JT Engineering
DESCRIPTION:
Set up and maintained traffic control and crash cushions. Work included demolition and removal of concrete pavements, sidewalk, and bridge structure. Installed new expansion joint at bridge in Wood County and Forest County. Raised sunken parapet wall and repointed masonry as well as various concrete repairs at Lincoln County bridge.
It is the policy of Norcon Corporation to strive for the highest safety standards on our projects. Safety does not occur by chance. It is the result of careful attention to all company operations by those directly or indirectly involved. Employees at all levels work diligently to execute the company’s policy of maintaining safety and occupational health.
Regard for the safety of the general public, our employees and the employees of our subcontractors are a supreme responsibility of all levels of our organization.